Difference between revisions of "Outline for a Technological Process Node"

From StemNode Lit Reviews
m
m
Line 80: Line 80:
 
| (Number and unit of time)
 
| (Number and unit of time)
 
|}
 
|}
 
=End of Life=
 
  
 
==Known Failures and Solutions==
 
==Known Failures and Solutions==
Line 104: Line 102:
 
==Warranties==
 
==Warranties==
 
<!--This only applies to specific systems (manuals on a specific make, model, or serial number).  Delete section for generalized systems -->
 
<!--This only applies to specific systems (manuals on a specific make, model, or serial number).  Delete section for generalized systems -->
 +
 +
=End of Life=
  
 
=System Variations=
 
=System Variations=
<!--Discuss Variations or modification on the System -->
+
<!--Discuss Variations, Modifications, or hacks on the System -->
  
==System Upgrades and Modifications==
+
==Upgrades, Modifications, Hacks==
  
==System Case Studies==
+
==Case Studies==
 
<!--This only applies to generalized systems (those that do not have a make, model, or serial number) that have specific systems within them.  Delete section for specific systems -->
 
<!--This only applies to generalized systems (those that do not have a make, model, or serial number) that have specific systems within them.  Delete section for specific systems -->
  

Revision as of 13:12, 18 November 2018

The goal of this outline is to standardize the communication of scientific and technical information. Try to follow the spirit of the outline but delete irrelevant sections and alter as needed. If information for a section is not available at the time of page creation, but the section is still relevant, keep the section to indicate the opportunity to contribute to others. Additional guidance is provided in comments that only appear in the source code.

Click "Edit Source" above, then copy and paste the text below the dotted line to start a page for a process node.


Authors:

This system is also called: Keywords:

Significance

Principles of Operation

Modes of Operation

Operating Specifications

Capacity

Requirements for Operation

Condition Optimum Operating Range Units Notes
(e.g. Mode 1) (e.g Mode 2) (e.g. Mode 3)
(e.g. Temperature) (Mode 1 Optimum) (Mode 2 Optimum) (Mode 3 Optimum) (e.g. 40-70) (e.g °C) (notes)
(e.g. pH) (e.g. 7) (e.g. 6.5-8.5) - (notes)

Ratios of Inputs to Outputs

Mathematical Models

Diagrams

Commissioning

Maintenance and Repair

Monitoring

Maintenance Schedule

Frequency Action Who Performs? Time to Complete
(state the frequency) (state the action) (User, Professional, Manufacturer, Anyone) (Number and unit of time)

Known Failures and Solutions

Problem Symptom (s) Fundamental Cause Solution
A goal the user cannot achieve Usually a measurable or observable attribute Connect to a more fundamental principle Action that can be taken

Warranties

End of Life

System Variations

Upgrades, Modifications, Hacks

Case Studies

Make Model Dates of Production End of Production Number Produced
(Insert Company) (Insert Model) (State a Date) (State a Date) (State a unitless quantity)
Location Date Installed Owner/Operator

Versions of the System

Version Dates of Production End of Production Number Produced
(Insert Version) (State a Date) (State a Date) (State a unitless quantity)

Safety

Cultural Considerations

Intellectual Property

Policies

Cost Data

Manufacturer Information